For full functionality of this site it is necessary to enable JavaScript.
EMINKH.COM
0

ANNOUNCEMENT OF HOLIDAY FOR HUNG KINGS' COMEMING ANNIVERSARY 2025

04/01/2025 16:25:39

EMIN Group would like to inform our customers and partners about the Hung Kings' Commemoration Day Holiday schedule.

HOLIDAY NOTICE – HUNG KINGS' COMMEMORATION DAY 2025

EMIN Vietnam Holiday Notice – Hung Kings' Commemoration Day

Dear Valued Customers and Partners,  

EMIN Vietnam would like to inform you of our holiday schedule for Hung Kings' Commemoration Day to facilitate travel and transactions as follows:  

👉 Holiday period: Monday, April 7, 2025 (1 day)  

👉 Resumption of work: Tuesday, April 8, 2025  

During the holiday, all our departments will be closed. If you have any urgent matters that require immediate assistance, please contact the responsible personnel for your order or the relevant department. Alternatively, you may leave an email at the following addresses:  

☎️ Hanoi: hn@emin.vn  

Hotline: (024) 35.381.269 - (024) 35.381.271 - (024) 35.381.272  

☎️ Bac Ninh: bn@emin.vn  

Hotline: 0936.415.843 - 0973.402.406  

☎️ Da Nang: dn@emin.vn  

Hotline: 0906.49.28.29 - 077.352.8806  

☎️ Ho Chi Minh City: hcm@emin.vn  

Hotline: 0916.508.932 - 0973.335.769  

☎️ Hai Phong: hp@emin.vn  

Hotline: 0987.222.477  

☎️ Dong Nai: dnai@emin.vn  

Hotline: 0345.689.536 - 0932.160.940  

We will get back to you as soon as we resume work.  

EMIN Vietnam wishes our valued customers and partners a joyful, healthy, and meaningful holiday!  

Best regards!

Related News

Voltage Drop and Sudden Power Output Loss in Factory Rooftop Solar Systems: 4 Warning Signs Requiring Investigation
09/07/2026 11:02:08

When a factory equipped with a rooftop solar array experiences a sudden drop in power output, it often sparks a dispute between the facility's electrical team and the solar installation contractor, with each side prone to blaming the other. The quickest way to resolve such a conflict is to accurately interpret the signs on-site—avoiding guesswork and refraining from hastily blaming the solar panels.

Mastering Open-Circuit Voltage (Voc) and Short-Circuit Current (Isc) Testing for Solar Panels: An Engineer's Standard
09/07/2026 09:33:07

A solar panel reports a drop in output, yet the entire array continues to operate normally where does the fault lie? The answer often becomes apparent the moment a field engineer measures two fundamental parameters: open-circuit voltage (Voc) and short-circuit current (Isc). These two figures make it possible to isolate faults whether in the panel itself, the wiring, or the charge controller without needing to disconnect the entire string from the system. This article details the standard engineering measurement procedure and explains how to interpret the results, eliminating guesswork when troubleshooting panel issues.

Connecting and configuring the optical amplifier optimized for the line
09/05/2026 10:39:06

In many automated workshops, control systems occasionally experience issues where output signals freeze or become unstable, or fail to accurately detect minuscule components passing through narrow gaps on the conveyor belt, causing the machining process to halt abruptly without an apparent root cause.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts