For full functionality of this site it is necessary to enable JavaScript.
EMINKH.COM
0

EMIN completed training module "Proceq Metal Instrument Standardized Service" in Singapoore

05/12/2018 09:37:28

Recently, EMIN has successfully completed the TRAINING MODULE "Proceq Metal Instrument Standardized Service" and is now authorized to carry out repairs, r

Recently, EMIN has successfully completed the TRAINING MODULE
"Proceq Metal Instrument Standardized Service"
and is now authorized to carry out repairs, replacements, upgrades and calibration of Proceq Concrete Instrument
Place: Proceq Asia Pte Ltd, Singapore
Date: 10th 11th May, 2018

The training modules covered the following specific topics:
• Functionality and operation of instrument
• Failure analysis of instrument and components
• Repairs of instrument and components
• Calibration of instrument and components
• Software Upgrade of instrument
The instruments covered were the Universal Platform, Equotip3 & Equotip Piccolo / Bambino.

Caption ...

Related News

Voltage Drop and Sudden Power Output Loss in Factory Rooftop Solar Systems: 4 Warning Signs Requiring Investigation
09/07/2026 11:02:08

When a factory equipped with a rooftop solar array experiences a sudden drop in power output, it often sparks a dispute between the facility's electrical team and the solar installation contractor, with each side prone to blaming the other. The quickest way to resolve such a conflict is to accurately interpret the signs on-site—avoiding guesswork and refraining from hastily blaming the solar panels.

Mastering Open-Circuit Voltage (Voc) and Short-Circuit Current (Isc) Testing for Solar Panels: An Engineer's Standard
09/07/2026 09:33:07

A solar panel reports a drop in output, yet the entire array continues to operate normally where does the fault lie? The answer often becomes apparent the moment a field engineer measures two fundamental parameters: open-circuit voltage (Voc) and short-circuit current (Isc). These two figures make it possible to isolate faults whether in the panel itself, the wiring, or the charge controller without needing to disconnect the entire string from the system. This article details the standard engineering measurement procedure and explains how to interpret the results, eliminating guesswork when troubleshooting panel issues.

Connecting and configuring the optical amplifier optimized for the line
09/05/2026 10:39:06

In many automated workshops, control systems occasionally experience issues where output signals freeze or become unstable, or fail to accurately detect minuscule components passing through narrow gaps on the conveyor belt, causing the machining process to halt abruptly without an apparent root cause.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts