For full functionality of this site it is necessary to enable JavaScript.
EMINKH.COM
0

INVITATION for VIIF 2019

09/30/2019 09:33:39

EMIN Việt Nam xin trân trọng kính mời quý khách hàng & quý đối tác đến tham quan gian hàng "Hội chợ quốc tế hàng công nghiệp Việt Nam 2019- VIIF 2019"

Following the success of VIIF 2018, VIIF 2019 – VIETNAM INTERNATIONAL INDUSTRIAL FAIR 2019 will be expanded in scale and expected to involve more than 350 domestic and international enterprises (from other countries: Korea, China, Taiwan, India, Hong Kong, Italy, Germany …), with a scale of more than 400 booths displayed on an area of nearly 10,000 m2 including Hall A1, A2, A3. 

VIIF 2019 - VIETNAM INTERNATIONAL INDUSTRIAL FAIR 2019 will be an opportunity for domestic and international businesses to display, introduce and promote their products and technologies to the market as well as potential customers. It will also be a place for enterprise to promote trade, business matching and expand their markets 

Exhibition fields:

1. Machinery and Equipment 

2. Machine Tool

3. Tools/Tooling

4. Metalworking Machines 

5. Electrical Equipment 

6. Automation 

7. Supporting Industries

8. Other Industrial sectors...

At this exhibition, EMIN will bring electrical and electronic measuring and testing equipment, and introduce to customers measurement solutions in the fields of mechanics, manufacturing, environment meter equipment, laboratory equipment & automation equipment, etc. Gives customer a close look about the quality of EMIN products and services.


EMIN Viet Nam booth

📍 EMIN Việt Nam Booth: Booth 149-151,A1 building

🏡 Venue:  I.C.E, 91 Tran Hung Dao, Ha Noi

⏱ Time: 09:00 - 17:00, 4 days 8~11/10/2019

Related News

Voltage Drop and Sudden Power Output Loss in Factory Rooftop Solar Systems: 4 Warning Signs Requiring Investigation
09/07/2026 11:02:08

When a factory equipped with a rooftop solar array experiences a sudden drop in power output, it often sparks a dispute between the facility's electrical team and the solar installation contractor, with each side prone to blaming the other. The quickest way to resolve such a conflict is to accurately interpret the signs on-site—avoiding guesswork and refraining from hastily blaming the solar panels.

Mastering Open-Circuit Voltage (Voc) and Short-Circuit Current (Isc) Testing for Solar Panels: An Engineer's Standard
09/07/2026 09:33:07

A solar panel reports a drop in output, yet the entire array continues to operate normally where does the fault lie? The answer often becomes apparent the moment a field engineer measures two fundamental parameters: open-circuit voltage (Voc) and short-circuit current (Isc). These two figures make it possible to isolate faults whether in the panel itself, the wiring, or the charge controller without needing to disconnect the entire string from the system. This article details the standard engineering measurement procedure and explains how to interpret the results, eliminating guesswork when troubleshooting panel issues.

Connecting and configuring the optical amplifier optimized for the line
09/05/2026 10:39:06

In many automated workshops, control systems occasionally experience issues where output signals freeze or become unstable, or fail to accurately detect minuscule components passing through narrow gaps on the conveyor belt, causing the machining process to halt abruptly without an apparent root cause.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts