For full functionality of this site it is necessary to enable JavaScript.
EMINKH.COM
0

INVITATION: Welcome to Vietnam International Industrial Fair (VIIF 2018)

10/02/2018 15:25:44

EMIN Vietnam would like to invite you to visit booth 151-153 at Vietnam International Industrial Fair (VIIF 2018). Here we provide solutions for measurement o

EMIN Vietnam would like to invite you to visit booth 151-153 at Vietnam International Industrial Fair (VIIF 2018). Here we provide solutions for measurement of electricity, electronics, environment, mechanics, etc. and other fields.


Time: October 23rd-26th, 2018, from 9:00 am to 5:30 pm 

Venue: International Exhibition Center - ICE Hanoi - 91 Tran Hung Dao, Hanoi

The event was held annually since 1991 with the aim of promoting trade and investment in the industrial sector among domestic enterprises; between Vietnamese enterprises and international enterprises. VIETNAM INTERNATIONAL INDUSTRIAL CONFERENCE 2018 - VIIF 2018 brings together more than 250 domestic and international enterprises with more than 350 booths. These companies operate in the following areas:

1. Machinery and Equipment.

2. Machine Tool

3. Tools / Tooling

4. Sheet Metalworking

5. Automation Electric Equipment

7. Supporting Industry

....... and other sectors of the industry.

Booth layout and EMIN booth location

EMIN Vietnam is pleased to welcome you!

NOTE: In order to avoid waiting for registration at the registration counter, you should register at: https://goo.gl/forms/POS9gtNQ4XEyLYOW2

Fill in the form and click "SEND"

Related News

Voltage Drop and Sudden Power Output Loss in Factory Rooftop Solar Systems: 4 Warning Signs Requiring Investigation
09/07/2026 11:02:08

When a factory equipped with a rooftop solar array experiences a sudden drop in power output, it often sparks a dispute between the facility's electrical team and the solar installation contractor, with each side prone to blaming the other. The quickest way to resolve such a conflict is to accurately interpret the signs on-site—avoiding guesswork and refraining from hastily blaming the solar panels.

Mastering Open-Circuit Voltage (Voc) and Short-Circuit Current (Isc) Testing for Solar Panels: An Engineer's Standard
09/07/2026 09:33:07

A solar panel reports a drop in output, yet the entire array continues to operate normally where does the fault lie? The answer often becomes apparent the moment a field engineer measures two fundamental parameters: open-circuit voltage (Voc) and short-circuit current (Isc). These two figures make it possible to isolate faults whether in the panel itself, the wiring, or the charge controller without needing to disconnect the entire string from the system. This article details the standard engineering measurement procedure and explains how to interpret the results, eliminating guesswork when troubleshooting panel issues.

Connecting and configuring the optical amplifier optimized for the line
09/05/2026 10:39:06

In many automated workshops, control systems occasionally experience issues where output signals freeze or become unstable, or fail to accurately detect minuscule components passing through narrow gaps on the conveyor belt, causing the machining process to halt abruptly without an apparent root cause.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts