For full functionality of this site it is necessary to enable JavaScript.
EMINKH.COM
0

Thông báo lịch nghỉ mát Tháng 4/2023 - Công ty CP EMIN Việt Nam

04/05/2023 10:45:56

Chương trình nghỉ mát của EMIN Việt Nam sẽ được diễn ra vào tháng 4 này. EMIN Việt Nam xin trân trọng thông báo lịch trình chi tiết để Quý Khách hàng, Quý Đối tác tiện đi lại và giao dịch

EMIN Vietnam Summer Trip will take place this April. EMIN Vietnam would like to announce a detailed schedule for valued customers and partners to easily transact.


To: Customers / Partners

First of all, EMIN Vietnam Joint Stock Company would like to send sincere thanks to customers, partners for cooperating and accompanying the Company during the past time.

As an annual routine, in order to take care of the spiritual life of employees, EMIN organizes the 2023 summer trip for all employees in April.

Working off time: From Friday, April 07, 2023 to Sunday, April 09, 2023.

Working back time: Monday, April 10, 2023.

During vacation, if customers, partners need urgent assistance, please contact the order manager directly or the relevant department. Or leave your email in the mailbox:

- Hanoi: hn@emin.vn

- Bacninh: bn@emin.vn

- Danang: dn@emin.vn

- HCMC: hcm@emin.vn

We will contact you as soon as possible after back to work.

EMIN would like to sincerely appreciate our valued Customers and Partners and would like to thank Customers and Partners who have been with EMIN during the past time.

Best regards!

Related News

Voltage Drop and Sudden Power Output Loss in Factory Rooftop Solar Systems: 4 Warning Signs Requiring Investigation
09/07/2026 11:02:08

When a factory equipped with a rooftop solar array experiences a sudden drop in power output, it often sparks a dispute between the facility's electrical team and the solar installation contractor, with each side prone to blaming the other. The quickest way to resolve such a conflict is to accurately interpret the signs on-site—avoiding guesswork and refraining from hastily blaming the solar panels.

Mastering Open-Circuit Voltage (Voc) and Short-Circuit Current (Isc) Testing for Solar Panels: An Engineer's Standard
09/07/2026 09:33:07

A solar panel reports a drop in output, yet the entire array continues to operate normally where does the fault lie? The answer often becomes apparent the moment a field engineer measures two fundamental parameters: open-circuit voltage (Voc) and short-circuit current (Isc). These two figures make it possible to isolate faults whether in the panel itself, the wiring, or the charge controller without needing to disconnect the entire string from the system. This article details the standard engineering measurement procedure and explains how to interpret the results, eliminating guesswork when troubleshooting panel issues.

Connecting and configuring the optical amplifier optimized for the line
09/05/2026 10:39:06

In many automated workshops, control systems occasionally experience issues where output signals freeze or become unstable, or fail to accurately detect minuscule components passing through narrow gaps on the conveyor belt, causing the machining process to halt abruptly without an apparent root cause.

Stay Updated with Offers

Get exclusive volume discounts, bulk pricing updates, and new product alerts delivered directly to your inbox.

By subscribing, you agree to our Terms of Service and Privacy Policy.

Quick Support

Direct access to our certified experts